Nain Office Building Renovations

When the design engineers called for tenders for the Nain Office Building Renovations the lowest tender received was approximately 50% higher than the allocated construction budget. As a result the Department of Nunatsiavut Affairs retained TSI to carry out the building renovations as per the design drawings on a time and material basis.

TSI ordered all the materials and hired local aboriginal sub-contractors to provide the labour for the rough in and finished carpentry work and for the installation of the electrical and mechanical systems. 

TSI was successful in completing the project on time and within the budget without any cost overruns due to extras.